The first job of a LG 1750 in the world, owned by The first LG 1750 has his first job: erecting the biggest windgenerator in the world with a capacity of 5 megawatt! The windgenerator will become a complete high of 186 meters (610 feet) and a tower high around 125 meters (410 feet). The complete plant will get around 1100 mtons, alone the machine-house on the top has around 260 mtons. if the planes will not change the complete machinehouse will be lifted on the tower. If you want to know more about this windgenerator look at REpower Sytems AG I was there for the first two days of assembling the crane, had to leave at the evening of the second day because I have an invitation for a very special cranejob in Italy, but later more from this at this place On this place many thanks to Nolte Cranes and REpower Systems AG for the possibility to make this pictures from the asembling of the crane |